The delivery of the geothermal doublet for Energie-Wende-Garching GmbH & Co Start engineering: 2008 End execution: 2009 Target: Delivery of a geothermal doublet Depth (AH): 2165m; 2227m Project Summary Client:originally AG Recycling GmbH, later Energie-Wende-Garching GmbH & Co Doublet/Triplet:Garching, Germany Wells:GAR-TH-01 & GAR-TH-02 Start Engineering:2008 End Engineering:2009 Target:The delivery of a geothermal doublet, to provide […]
Read moreMonthly Archives: June 2009
Oil&Gas: NPN Nieuwendijk-1 drilling
Oil exploration well Nieuwendijk-1 drilling Start execution: April 20th 2009 End execution: June 3rd 2009 Result: Nieuwendijk-1 was successfully drilled Depth (AH): 2677m Project Summary Client: Northern Petroleum Nederland B.V. Location: Nieuwendijk Wells: Nieuwendijk-1 Start Execution: August 20th 2009 End Execution: June 3rd 2009 Target: The realization of a new oil exploration well. Result: Nieuwendijk-1 […]
Read moreNew Technology: Pump Out Reamer Shoe
Pump Out Reamer Shoe designed and manufactured Start execution: 2009 End execution: 2009 Result: Successfully runned with an HWU into a pressurized cavern. Role of WEP: WEP was the initiator and did all engineering and manufacturing Project Summary Client:All WEP’s Salt Clients Description:New technology, custom made Pump Out Reamer Shoe Wells:A sidetrack into a pressurized […]
Read more