Oil&Gas: NPN Nieuwendijk-1 drilling

Oil exploration well Nieuwendijk-1 drilling Start execution: April 20th 2009 End execution: June 3rd 2009 Result: Nieuwendijk-1 was successfully drilled Depth (AH): 2677m Project Summary Client: Northern Petroleum Nederland B.V. Location: Nieuwendijk Wells: Nieuwendijk-1 Start Execution: August 20th 2009 End Execution: June 3rd 2009 Target: The realization of a new oil exploration well. Result: Nieuwendijk-1 […]

Read more

New Technology: Pump Out Reamer Shoe

Pump Out Reamer Shoe designed and manufactured Start execution: 2009 End execution: 2009 Result: Successfully runned with an HWU into a pressurized cavern. Role of WEP: WEP was the initiator and did all engineering and manufacturing Project Summary Client:All WEP’s Salt Clients Description:New technology, custom made Pump Out Reamer Shoe Wells:A sidetrack into a pressurized […]

Read more