ECI and HSCC was presented at ATCE Amsterdam

November 2014, Amsterdam, The Netherlands WEP subsidiaries Acquit and HWT proudly presented the Enhanced Casing Installation (ECI), and High Strength Composite Casing (HSCC) at the ATCE in Amsterdam, the Netherlands, last October. ATCE is the annual technical conference and exhibition of the Society of Petroleum Engineers. ECI is an innovative retrievable casing installation system that […]

Read more

Geothermal energy update September 2014

September 2014, Hoogeveen, The Netherlands Up to present date, September 2014, a total of 30 geothermal wells have been drilled in the Netherlands, of which a total of 25 wells were engineered and managed by Well Engineering Partners. The other 5 geothermal wells were drilled under the management of a Drilling Manager now working with […]

Read more

WEP presents “Re-drill into a high-pressure Cavern to re-establish brine production” at the upcoming SMRI conference

July 2014, Hoogeveen, The Netherlands At the upcoming SMRI fall 2014 conference WEP will present the paper “Re-drill into a high-pressure Cavern to re-establish brine production”.   The magnesium salts carnallite and bischofite are being solution mined by NEDMAG on the mining location near Veendam in the Netherlands.  The magnesium salts are mined at an […]

Read more

Royal couple admires Geothermal Dream

May 28th 2013, Dwingeloo, the Netherlands In May 2013 the newly crowned king of the Netherlands Willem-Alexander visited the area where WEP is located. The king was accompanied by the new queen Maxima. The visit is a part of their acquaintance tour to present themselves to the citizens of the Netherlands. In this tour, every […]

Read more