New Technology: Packoff sub (POS)

Developing and testing a Packoff Sub Start execution: 2011 End execution: 2011 Result: Successfully performed several production tests with the POS Role of WEP: WEP was the initiator and did all developing and testing Project Summary Client:WEP internal project Description:New technology, developing and testing the Packoff Sub (POS) Wells:Several production wells Start Execution:2011 End Execution:2011 […]

Read more

New Technology: Special launch sub

Building a Special Launch Sub to install casing during drilling Start execution: 2010 End execution: 2010 Result: Successfully installed two casing strings in one run drilling Role of WEP: WEP was the initiator and did all engineering and manufacturing; and managing during the installation. Project Summary Client:One of WEP’s Salt clients Description:New technology, building and […]

Read more

New Technology: Pump Out Reamer Shoe

Pump Out Reamer Shoe designed and manufactured Start execution: 2009 End execution: 2009 Result: Successfully runned with an HWU into a pressurized cavern. Role of WEP: WEP was the initiator and did all engineering and manufacturing Project Summary Client:All WEP’s Salt Clients Description:New technology, custom made Pump Out Reamer Shoe Wells:A sidetrack into a pressurized […]

Read more