New Technology: Pump Out Reamer Shoe

Pump Out Reamer Shoe designed and manufactured Start execution: 2009 End execution: 2009 Result: Successfully runned with an HWU into a pressurized cavern. Role of WEP: WEP was the initiator and did all engineering and manufacturing Project Summary Client:All WEP’s Salt Clients Description:New technology, custom made Pump Out Reamer Shoe Wells:A sidetrack into a pressurized […]

Read more

Salt: Nedmag Magenesium-brine wells workover

Several Magnesium-brine producing wells workover operations Start execution: May 13th 2008 End execution: June 17th 2008 Result: Successfull HWO operations on magnesium-brine producing wells. Depth (AH): n/aDepth (TVD): n/a Project Summary Client: Nedmag Location: Veendam Wells: Magnesium-brine producing wells Start Execution: May 13th 2008 End Execution: June 17th 2008 Target: Re-complete the wells with a […]

Read more

Oil&Gas: Gasunie Zuidwending Gas Storage

Studies and modelling on gas storage caverns Start execution: September 2006 End execution: February 2008 Result: Extended advisory Depth (TVD): Approx. 1300 – 1450m Project Summary Client:N.V. Nederlandse Gasunie Location:Zuidwending – Heiligerlee Wells:ZW. A2, A3, A4, A6 Start Execution:September 2006 End Execution:February 2008 Target:Development of injection and production wells for gas storage in caverns Result:Extended […]

Read more

Oil&Gas: Maghreb Petroleum 2 gas exploration wells drilling

Two oil exploration wells drilling Start execution: March 22nd 2006 End execution: July 3rd 2006 Result: The two exploration wells were successfully drilled Depth (TVD): Both approx. 2700m Project Summary Client: Maghreb Petroleum Exploration S.A. (MPE) Location: Tendrara, Morocco Wells: Two gas exploration wells Start Execution: March 22nd 2006 End Execution: July 3rd 2006 Target: […]

Read more

Geothermal: Gemeente Heerlen doublet delivery

Geothermal doublet HLH-GT-01 & HLH-GT-02 Start execution: 2006 End execution: 2006 Result: Successful delivery of the doublet Depth (AH): 692m; 695m Project Summary Client:Gemeente Heerlen Doublet:Heerlerheide Wells:HLH-GT-01 & HLH-GT-02 Start Execution:2006 End Execution:2006 Target:Drilling a geothermal doublet into an old coal mine Result:Successful delivery of the doublet Depths (AH):HLH-GT-01: 692m; HLH-GT-02: 695m Role of WEP:This […]

Read more