Geothermal doublet LSL-GT-01 & LSL-GT-02

Start execution: August 1st 2017
End execution: December 1st 2017

Result: Water flowrates of 360 m3/hr at > 60 degrees Celsius

Depth (AH): 2709m; 2860m

Project Summary

Client:Warmtebedrijf Bergschenhoek
Doublet:Lansingerland
Wells:LSL-GT-01 & LSL-GT-02
Start Execution:August 1st 2017
End Execution:December 1st 2017
Target:Water flowrates of 350 m3/hr at 60 degrees Celsius
Result:Water flowrates of 360 m3/hr at > 60 degrees Celsius
Power (thermal):10 MWTh
Depths (AH):LSL-GT-01: 2709m; LSL-GT-02: 2860m
Role of WEP:WEP was responsible for the well design and supervision during the execution of the project.
Challenges:The intermediate section was challenging, high inclination (>50 degrees) drilled with WBM and PDM BHA.

Project Description

Huisman LOC-400 “Heracles” rig was rigged up over LSL-GT-01 in August and this production well was completed in October. Well was successfully drilled and completed; In particular the intermediate section was challenging, high inclination (>50 degrees) drilled with WBM and PDM BHA. The client was satisfied with the flowrates and temperatures experienced during the production test (360 m3/hr / 60 degrees Celsius). The second well LSL-GT-02 was successfully drilled and completed with even a higher well inclination (>60 degrees). Well testing results were also satisfying the client.

For this project, Well Engineering Partners was responsible for the well design and supervision during the execution of the project. The “Huisman-Züblin” joint venture was responsible for the tendering, logistics, provision and coordination of materials & services (contractors) and the execution of the project.