Salt producing well PA31 sidetrack
Start execution: April 24th 2010
End execution: May 25th 2010
Result: A 450m sidetrack to the existing salt producing well.
Depth (AH): n/a
Depth (TVD): n/a
Project Summary
Client: | Arkema |
Location: | Vauvert, France |
Wells: | PA31 |
Start Execution: | April 24th 2010 |
End Execution: | May 25th 2010 |
Target: | Drilling a sidetrack for a Sodium Chloride Brine producing well |
Result: | A 450m sidetrack to the existing salt producing well. |
Depths (AH): | n/a |
Depths (TVD): | n/a |
Role of WEP: | Well Engineering Partners provided wireline activities, Design documentation, HSE documentation, Material & Service procurement, Drilling management and Testing of the well |
Challenges: | n/a |
Project Description
Arkema hires Well Engineering Partners for various well intervention and drilling services. Arkema is a world-class producer in most of its product lines, including PMMA, fluorochemicals, hydrogen peroxide, organic peroxides and molecular sieves, and a regional leader in others, including chlorochemicals in Europe. One of the Sodium Chloride Brine Producing wells needed a 450 m sidetrack. This was fully designed, project managed and successfully completed by Well Engineering Partners on behalf of Arkema.