Oil & Gas

Oil&Gas: Gasunie ZDW-A1A & – A1B Workover

Project Description

Gasunie intends to integrate the cavern A1 into its existing underground gas storage (Aardgasbuffer Zuidwending). There are two wells in the cavern that needed to be equipped with a gas well completion. Within the new completions a permanent packer and a subsurface safety valve are installed on both wells. The welded completions will be hung-off in tension on the tension head. Well ZWD-A1A is equipped with a long tailpipe that extends to the bottom of the cavern. The working program covered the major working steps to be performed for the installation of the completion in the wells ZWD-A1A and ZWD-A1B.

Challenges

Complex completion system, composed of a welded 9-⅝” production casing and packers which required specific and detailed welding and completion assembly procedures.

Role of WEP

Well site supervision (day and night shift) and engineering provision.

Overview

  • Client
    N.V. Nederlandse Gasunie (EnergyStock)
  • Location
    Zuidwending
  • Well
    ZWD-A1A & ZWD-A1B
  • Date
    Start drilling: 23 March 2020
    End execution: 05 June 2020
  • Objective
    Integration of cavern A1 into the existing underground gas storage.
  • Depth
    Depth (MD): 1394.5 m
    Depth (TVD): 1391.5 m

View project on the map

Name
Workover operations on ZDW-A1A & ZDW-A1B
Description
Integration of cavern A1 into the existing underground gas storage.
Start Execution
March 23rd, 2020
End Execution
June 5th, 2020
Integration of cavern A1 into the existing underground gas storage.