Geothermal

Geothermal: Aardwarmte Vogelaer doublet delivery

Project Description

After a period of intensive (engineering) preparations, drilling for geothermal heat has started in August 2016 in Poeldijk, the Netherlands. The DrillTec VDD370.2 VarioRig spudded the first well on August 18th, 2016. Two wells were planned to be drilled forming a geothermal doublet for heating several greenhouses in the Poeldijk area.

Drilling and testing operations were finished for Aardwarmte Vogelaer on November 6th, 2016. Wells PLD-GT-01 and PLD-GT-02 were drilled and tested successfully using the DrillTec Vario rig.

Well Engineering Partners provides engineering during the preparations and drilling management during the execution on behalf of Aardwarmte Vogelaer.

Challenges

n/a

Role of WEP

WEP was responsible for the well design and supervision during the execution of the project.

Overview

  • Client
    Aardwarmte Vogelaer
  • Location
    Poeldijk
  • Well
    PLD-GT-01 & PLD-GT-02
  • Date
    Start drilling: 18 August 2016
    End execution: 06 November 2016
  • Objective
    Warm water for heating of greenhouses
  • Depth
    Depth (MD): PLD-GT-01: 2799m; PLD-GT-02: 2712m
    Depth (TVD): PLD-GT-01: 2460m; PLD-GT-02: 2435m

View project on the map

Name
Geothermal doublet PLD-GT-01 & PLD-GT-02
Description
Warm water for heating of greenhouses.
Start Execution
August 18th, 2016
End Execution
November 6th, 2016
Warm water for heating of greenhouses