Geothermal

Geothermal: Floricultura Heemskerk doublet delivery

Project Description

Well Engineering Partners (WEP) spudded at March 23rd 2013 the geothermal production well HEK-GT-01 in Heemskerk for Dutch company Floricultura BV, the market leading specialist in Orchid breeding, selection and propagation. The HEK-GT-01 is the first well of the doublet. At the January 2nd 2014 the second well HEK-GT-02 was completed and handed over for use.

Both wells HEK-GT-01 and HEK-GT-02 of the geothermal doublet are drilled from the same location. The wells were drilled in the Slochteren sandstone formation reaching depths over 2600 m vertical from the surface. The Slochteren sandstone formation is the reservoir that is deployed for providing the geothermal heat.

Drilling was performed using a 300 metric ton rig. WEP provided well engineering, support and well site supervision on the drilling and well testing.

Floricultura intends to use the geothermal capacity from the wells to heat their Heemskerk greenhouse facilities, covering about 10 hectares. Yearly over 10 million young orchid flower plants, total consisting of more than 14 species, are grown in this greenhouse complex. The young plants are sold worldwide.

Challenges

n/a

Role of WEP

WEP provides engineering and project management services and wellsite supervision for this project.

Overview

  • Client
    Ce-Ren Beheer / Floricultura
  • Location
    Heemskerk
  • Well
    HEK‐GT‐01 & HEK‐GT‐02
  • Date
    Start drilling: 23 March 2013
    End execution: 02 January 2014
  • Objective
    Water flowrates at approximately 90 degrees Celsius.
  • Depth
    Depth (MD): HEK‐GT‐01: 3216m; HEK‐GT‐01: 3200m
    Depth (TVD): HEK‐GT‐01: approx. 2600m; LSL-GT-02: approx. 2600m

View project on the map

Name
Geothermal doublet HEK‐GT‐01 & HEK‐GT‐02
Description
Water flowrates at approximately 90 degrees Celsius.
Start Execution
March 23rd, 2013
End Execution
January 2nd, 2014
Water flowrates at approximately 90 degrees Celsius.

Other recent projects