Geothermal

KKP-GT-03 engineering new producer well

Project Description

The client requested WEP to design an additional producer well, to upgrade the existing doublet (KKP-GT-01 & KKP-GT-02 delivered by WEP in 2011) into a triplet. The current scope encompasses the delivery of a comprehensive well design and the subsequent tender documents. Also, frameworks for the drilling program and HSE documents will be delivered by WEP.

Challenges

n/a

Role of WEP

For this project, Well Engineering Partners is responsible for the full project engineering.

Overview

  • Client
    Provincie Overijssel / Aardwarmtecluster I KKP B.V.
  • Location
    IJsselmuiden / Koekoekspolder
  • Well
    KKP-GT-03 (additional to existing wells KKP-GT-01 & KKP-GT-02)
  • Date
    Start drilling: 04 January 2019
    End execution: 01 May 2019
  • Objective
    Engineering 2nd producer well, upgrade to triplet.
  • Depth
    Depth (MD): not defined yet
    Depth (TVD): Max. 2000m

View project on the map

Name
Geothermal producer well KKP-GT-03 (additional to existing doublet KKP-GT-01 & KKP-GT-02)
Description
Slochteren, a 2nd producer well. The existing doublet is delivered in 2011 by WEP, will be upgraded to a triplet.
Start Execution
January 4th, 2019
End Execution
May 1st, 2019
The client requested WEP to design an additional producer well, to upgrade the existing doublet (KKP-GT-01 & KKP-GT-02 delivered by WEP in 2011) into a triplet.