Other: Kanton Basel Landschaft MMA-1 / MSC-1 Evalutation Well Integrity

Project Description

For the canton of Basel-Landschaft, WEP assessed the integrity of two monitoring wells near Basel, Switzerland.

The work began with a review of the well data following construction and concluded with wireline logging on both wells. The resulting data was processed, analyzed, and visualized to develop casing profiles, after which a final report was prepared. Both were completed safely and without incident.

Role of WEP

WEP’s scope included well engineering, planning, reporting, and development of the wireline program. During the operational phase, WEP delivered onsite SSV and office support.

Overview

  • Client
    Kanton Basel Landschaft
  • Location
    Basel, Switzerland
  • Well
    MMA-1 / MSC-1
  • Date
    Start: 08 August 2025
    End: 21 May 2026
  • Objective
    Evaluate the well integrity of two monitoring wells by performing wireline logs.
  • Depth
    Depth (MD): 142 / 143 m (vertical)
    Depth (TVD): N/A

View project on the map

Name
MMA-1 / MSC-1
Description
Evaluate the well integrity of two monitoring wells by performing wireline logs.
Start
August 8th, 2025
End
May 21st, 2026
For the canton of Basel-Landschaft, WEP assessed the integrity of two monitoring wells near Basel, Switzerland.