Geothermal

Geothermal: Duurzaam Voorne geothermal doublet

Project Description

To cope with corrosion issues without injection of corrosion inhibitor a detailed well design making use of corrosion-resistant materials was made by WEP, in close cooperation with our project partners; Hydreco Geomec, HVC, and Veegeo. WEP assisted in the procurement of well materials and prepared the drilling programs and HSE documents. Drilling of the two geothermal wells was without major problems and the installation of the GRE-lined casing was also a success. Drilling started in March 2020 and was completed in May 2020 using the DrillTec Vario Rig.

Challenges

New type of well design.

New Technology:
Use of corrosion resistant materials to ensure life time of the wells.

Role of WEP

Well design, Procurement, Drilling Program, HSE documents, Drilling Management and Support.

Overview

  • Client
    Duurzaam Voorne Holding B.V.
  • Location
    Voorne
  • Well
    TNT-GT-01 & TNT-GT-02
  • Date
    Start drilling: 04 December 2018
    End execution: 22 May 2020
  • Objective
    Well design, Procurement, Drilling Program, HSE documents, Drilling Management and Support.
  • Depth
    Depth (MD): TNT-GT-01: 2857m; TNT-GT-02: 2707m
    Depth (TVD): TNT-GT-01: 2569m; TNT-GT-02: 2490m

View project on the map

Name
Target: The Trias reservoir
Description
Target: The Trias reservoir
Start Execution
December 4th, 2018
End Execution
May 22nd, 2020
Well design, Procurement, Drilling Program, HSE documents, Drilling Management and Support.