A special Launch Sub was built for one of our salt producing customers to be able to install casing while drilling. Actually, two casing strings were installed in one run when drilling through an existing cavern. The purpose of the Launch Sub was to drill the new casing until target depth with the same BHA as used for the previous casing. This required a wireline activated take-over functionality. The disposable BHA was left in the hole and was shot off after reaching the target depth. The remaining part of the Launch Sub is used as an injection point with sideway outflow advantage. Taking over the launch sub was successful in one attempt, pressure test showed that the seals of the connection functioned properly. With the use of Finite Element Analyses, a design optimization was done to eliminate high occurring stresses due to high drilling forces and torques, which could lead to damage and failure of the tool. The launch sub is an example of a solution where well engineers worked together with mechanical engineers to find a unique solution for a specific problem.

Challenges

New technology

Role of WEP

WEP was the initiator of this new technology and did all engineering, manufacturing and installing.

Overview

  • Client
    One of WEP's Salt clients
  • Location
    n/a
  • Well
    Well in an existing cavern
  • Date
    Start drilling: 01 January 2010
    End execution: 31 May 2010
  • Objective
    Demonstrating the new technology of the special Launch Sub.
  • Depth
    Depth (MD): n/a
    Depth (TVD): n/a

View project on the map

Name
Well in an existing cavern
Description
Two casing strings were installed in one run when drilling through an existing cavern
Start Execution
January 1st, 2010
End Execution
May 31st, 2010
Special launch sub A special Launch Sub was built for one of our salt producing customers to be able to install casing while drilling. Actually, two casing strings were installed in one run when drilling through an existing cavern. The purpose of the Launch Sub was to drill the new casing until target depth with […]