Oil&Gas: Abandonment well and drilling sidetrack in Middle East

Abandonment current well and Sidetrack drilling Start engineering:Q1 2020 (Expected) End date: Q2 2021 Objective: Collect data and bring well into production Depth (MD): 5000 mMD Depth (TVD): 4800 mTVD Project Summary Client:Operator in the Middle East Location:Middle East Wells:Existing well Start Engineering:Q1 2020 (Expected) End:Q2 2021 Project Objective:Collect data and bring well into production […]

Read more