Abandonment current well and Sidetrack drilling Start engineering:Q1 2020 (Expected) End date: Q2 2021 Objective: Collect data and bring well into production Depth (MD): 5000 mMD Depth (TVD): 4800 mTVD Project Summary Client:Operator in the Middle East Location:Middle East Wells:Existing well Start Engineering:Q1 2020 (Expected) End:Q2 2021 Project Objective:Collect data and bring well into production […]
Read moreCategory Archives: Projects
In this category, you can find all projects of WEP, like geothermal projects, salt projects and oil&gas projects
Geothermal: Feasibility design geothermal project
Engineering support in the feasibility stage Start engineering: November 2020 End engineering: November 2020 Objective:Drafting a feasibility design for a geothermal project Depth (TVD): 2000 m – 3500m Project Summary Client:Municipality (in the Netherlands) Start Engineering:November 2020 End Engineering:November 2020 Project Objective:Drafting a feasibility design for a geothermal project in the Netherlands. Result:Complete feasibility design […]
Read moreSalt: Frisia HVM-02 drilling
Salt well HVM-02 drilling Start Engineering: January 2018 End execution: November 2020 Objective: Design and drill an ERD salt well, from the FRISIA Havenmond location to the Havenmond concession. Depth (MD): 4950mDepth (TVD): 3021m Project Summary Client: FRISIA Location: Havenmond Wells: HVM-02 Start Engineering: January 2018 End Execution: November 2020 Objective: Design and drill an […]
Read moreSalt: Nedmag TR-7 workover 2020
Salt well TR-7 workover Start Engineering: November 2018 End execution: November 2020 Objective: Re-complete well Depth (MD): 1726mDepth (TVD): 1480m Project Summary Client: Nedmag BV Location: WHC-2 / Tripscompagnie Wells: TR-7 Start Engineering: November 2018 End Execution: November 2020 Objective: Re-complete well Depths (MD): 1726m Depths (TVD): 1480m Role of WEP: Engineering and planning support […]
Read moreGeothermal: Trias Westland second geothermal doublet
Engineering and drilling new geothermal doublet NLW-GT-03-S1 and NLW-GT-04 Start engineering: October 2018 End drilling: August 2020 Objective: Realise second geothermal doublet for Trias Westland. Depth (MD): 2600m; 3015m Depth (TVD): 2494m; 2401m Project Summary Client:Trias Westland B.V. Doublet/Triplet:Naaldwijk Wells:NLW-GT-03-S1 and NLW-GT-04 Start Engineering:October 2018 End Execution:August 2020 Project Objective:Realise second geothermal doublet for Trias […]