Delivery of salt doublet, wells PA32 and PA 33 Start execution: June 7th 2012 End execution: September 21st 2012 Result: The doublet was successfully drilled without LTI’s and within the available budget Depth (AH): 2400m; 2600m Project Summary Client: KEM ONE Location: Vauvert, France Wells: Doublet PA32 and PA33 Start Execution: June 7th 2012 End […]
Read moreMonthly Archives: June 2012
New Technology: Injection Pressure Control Valve (IPCV)
Engineering and manufacturing an Injection Pressure Control Valve (IPCV) Start execution: 2012 End execution: 2012 Result: Successfully engineering and manufacturing the IPCV Role of WEP: WEP was the initiator and did all engineering and manufacturing Project Summary Client:WEP internal project Description:New technology, Injection Pressure Control Valve Wells:Geothermal doublet Start Execution:2012 End Execution:2012 Target:Engineering and manufacturing […]
Read more