The Haaksbergen brinefield development project involved drilling eight brine production wells to supply Nobian’s factory in Hengelo. DrillTec’s Compact rig was contracted for this campaign. The wells configuration consisted of 30” conductor, 18-⅝” surface casing, 13-⅜” last cemented casing, and 10-¾” / 7” outer / inner dilution strings. The main well construction challenges for Haaksbergen were tight target tolerances and the execution of a complex data acquisition program for selected well intervals (XLOT, PLOT, and coring in overburden and cavern intervals). These logged intervals (8-½”) were underreamed to 16”. Most wells were drilled within one month, including rig moves between wells that typically took one week. We would like to thank all parties involved for making this drilling campaign a success, including Nobian, DrillTec, WellPerform, Halliburton, Schlumberger, Geo Data, GeoKrak, IOT, Odfjell, Weatherford and Solexperts,

Challenges

Drilling in a NIMBY environment, complex downhole data acquisition scope

Role of WEP

Senior Drilling Engineer, planning, and work programs. Well Examination. Onsite drilling supervision support and drilling engineering support from the office.

Overview

  • Client
    Nobian
  • Location
  • Well
    HSK-H-1 / -7
  • Date
    Start: 01 July 2025
    End: 09 June 2026
  • Objective
    Drill 8 wells from Nobian’s Haaksbergen locations into the Zechstein.
  • Depth
    Depth (MD): 950 – 1150m
    Depth (TVD): 950 – 1150m

View project on the map

Name
Haaksbergen drilling project
Description
Haaksbergen Brinefield Development involved the successful drilling of eight brine production wells for Nobian, featuring a complex well design and an extensive data acquisition program under challenging target tolerances. Most wells were completed within one month, demonstrating efficient execution through close collaboration between all project partners.
Start
July 1st, 2025
End
June 9th, 2026
Drill 8 wells from Nobian’s Haaksbergen locations into the Zechstein.