Geothermal injector KKP-GT-02 lost its injectivity after being in use for about one year. An investigation, by means of wireline, proved that the well was plugged with lead. Because a regular clean-out operation using coiled tubing was no option, WEP developed a chemical solution for this problem. A “cocktail”, not being harmful to the casing / well integrity was developed by WEP in order to dissolve lead scaling.

The cocktail was spotted at the obstruction down in the well through a workstring run by a crane. The operation was carried out successfully and injectivity in the well has been fully restored. The geothermal doublet is operational again.

Prevention of lead precipitation in geothermal wells:

WEP also worked out a method that prevents precipitation of lead. This method is now in use at the wells in Koekoekspolder and is (will be) closely monitored to keep the doublet running for many years. An additional advantage of the prevention method is that the well is better protected against corrosion. Corrosion is the major cause of lead precipitation; No corrosion, No lead issues!

Challenges

A regular clean-out operation using coiled tubing was no option.

Role of WEP

WEP was responsible for the investigation of the problem, engineering the solution and managing the execution of the solution.

Overview

  • Client
    Greenhouse Geopower
  • Location
    Koekoekspolder, Ijsselmuiden
  • Well
    KKP-GT-02
  • Date
    Start drilling: 01 January 2014
    End execution: 31 January 2014
  • Objective
    Restoring the injectivity.
  • Depth
    Depth (MD): n/a
    Depth (TVD): n/a

View project on the map

Name
Geothermal injector well KKP-GT-02
Description
Restoring the injectivity.
Start Execution
January 1st, 2014
End Execution
January 31st, 2014
Injectivity is fully restored and the doublet is operational again.