Magnesium brine producing well VE-4 workover operation Phase I Start execution: May 2016 End execution: July 2016 Result: Completion removed and measurements performed. Depth (Ah): 1745mDepth (TVD): 1635m Project Summary Client: Nedmag Location: Veendam Wells: VE-4 Start Execution: May 2016 End Execution: July 2016 Target: Removing the current completion from the well and performing measurements […]
Read moreCategory Archives: Projects
In this category you will find all of WEP’s projects, such as geothermal projects, salt projects and oil & gas projects.
Salt: ESCO – Frisia BAS-3O Workover operation 2016
Salt producing well BAS-3O workover operation Start execution: April 2016 End execution: April 2016 Result:Completed successfully a Hydraulic Workover Snubbing Operation. Depth (AH): 4632m Project Summary Client: Frisia Location: Harlingen Wells: BAS-3O Start Execution: April 2016 End Execution: April 2016 Target: The objective of the workover is to run the inner leaching string to new […]
Read moreGeothermal: CLG Geothermie doublet delivery
Geothermal doublet CAL-GT-04 & CAL-GT-05 Start execution: November 16th 2015 End execution: April 14th 2016 Result: Water flowrates of 375 m3/hr at 80 degrees Celsius Depth (AH): 3037m; 2433m Depth (TVD): 2592m; 2011m Project Summary Client:Californië Lipzig Gielen (CLG) Geothermie Doublet:Grubbenvorst Wells:CAL-GT-04 & CAL-GT-05 Start Execution:November 16th 2015 End Execution:April 14th 2016 Target:Development of geothermal […]
Read moreNew Technology: Enhanced Casing Installation field trial
Field trial Enhanced Casing Installation (ECI) Start execution: December 1st 2015 End execution: January 31st 2016 Result: Successful trial showing the potential of ECI Role of WEP: WEP provided engineering & drilling management and is a shareholder of HWT. Project Summary Client:Huisman Well Technology B.V. (joint venture between WEP and Huisman Equipment) Description:New technology, field […]
Read moreNew Technology: ECI Rotary Steerable System development
Developing of ECI Rotary Steerable System Start execution: 2014 End execution: 2016 Result: An RSS based on unique features of the Enhanced Casing Installation (ECI) system. Role of WEP: WEP provided (well) engineering expertise and is a shareholder of HWT. Project Summary Client:Huisman Well Technology B.V. (joint venture between WEP and Huisman Equipment) Description:New technology, […]
Read more