Advise and support on well designs and drilling management for several oil wells
Start execution: June 2013
End execution: March 2014
Result: Extended advisory and support (reports)
Depth (AH): 620 - 1746m
Depth (TVD): 620 – 1672m
Project Summary
Client: | PetroReconcavo |
Location: | Campo de Cassarongongo, Bacia do Recôncavo (Brasil, Bahia) |
Wells: | MJAG, CSAG, ROAG |
Start Execution: | June 2013 |
End Execution: | March 2014 |
Target: | Assisting PetroReconcavo with its well design and drilling activities to achieve drilling operational excellence. |
Result: | Extended advisory and support (reports) |
Depths (AH): | 620 - 1746m |
Depths (TVD): | 620 – 1672m |
Role of WEP: | Well Engineering Partners provided Drilling Operations support, Well Engineering support and Capacity building, by means of its technical expertise and engineering skills. |
Challenges: | n/a |