Engineering support in the feasibility stage
Start engineering: November 2020
End engineering: November 2020
Objective:Drafting a feasibility design for a geothermal project
Depth (TVD): 2000 m - 3500m
Project Summary
Client: | Municipality (in the Netherlands) |
Start Engineering: | November 2020 |
End Engineering: | November 2020 |
Project Objective: | Drafting a feasibility design for a geothermal project in the Netherlands. |
Result: | Complete feasibility design |
Depths (TVD): | 2000 - 3500m, two reservoir formation depths are present on the location |
Role of WEP: | WEP provides engineering support during the feasibility stage. |
Challenges: | Limited geological or offset information available as basis of design. |
Project Description
In this project, WEP creates a feasibility design for a geothermal project in the Netherlands. The client is a municipality. The initial design and cost estimate are based on limited / early stage geological information.
Source image: nlog.nl